Cockpit Modification Concept:
- Companionway: Relocate the companionway to a more central location. 
- Existing Deck: The deck between the companionway and the existing cockpit is elevated because of the saloon below 
- Benches Height: Keep the benches as low as possible 
- Running Rigging Gap: The 6” gap beneath the benches is for running rigging to be routed back to the winches. 
- Tubing Backs: The tubing railing would be angled slightly for the bench backs 
- Canvas Bimini: We intend to add a canvas bimini over the new benches to provide shade and rain protection 
- Hard Bimini: A hard bimini would be installed over the existing cockpit and would allow for an optional canvas dodger 
- Existing Cockpit: While secure the space is very limited with a single bench along the transom 
- Seating Reconfiguration: Relocate the cockpit benches port and starboard and add a walkthrough to a swim platform 
- End Goal: Our priority is to create a safe outdoor space that doesn’t require our kids to walk the 7 feet along the starboard lifelines in foul weather 
 
                         
               
               
               
               
               
               
               
               
               
               
               
               
               
               
               
              