Cockpit Modification Concept:

  • Companionway: Relocate the companionway to a more central location.

  • Existing Deck: The deck between the companionway and the existing cockpit is elevated because of the saloon below

  • Benches Height: Keep the benches as low as possible

  • Running Rigging Gap: The 6” gap beneath the benches is for running rigging to be routed back to the winches.

  • Tubing Backs: The tubing railing would be angled slightly for the bench backs

  • Canvas Bimini: We intend to add a canvas bimini over the new benches to provide shade and rain protection

  • Hard Bimini: A hard bimini would be installed over the existing cockpit and would allow for an optional canvas dodger

  • Existing Cockpit: While secure the space is very limited with a single bench along the transom

  • Seating Reconfiguration: Relocate the cockpit benches port and starboard and add a walkthrough to a swim platform

  • End Goal: Our priority is to create a safe outdoor space that doesn’t require our kids to walk the 7 feet along the starboard lifelines in foul weather